Work section
Construction projects are typically broken down into basic operations (work sections) which involve undertaking tasks that are similar and therefore convenient to group as one activity. This may be for the purposes of phasing or to realise time or cost savings. The activities within one work section may be linked in terms of construction method, materials or sequence.
Each of the work sections typically involves only one main trade. It may involve work on a part of a building (e.g conservatory) or work involving a type of material (e.g brickwork, stone or glass-block walling) or a specific activity (such as site survey or demolition). When all the work sections identified are combined, they will represent the entire programme of work for the project.
The content of each of the work sections is defined by means of a schedule of basic quantities. This will allow quantification of the resources required to complete each operation.
The Common Arrangement of Work Sections (CAWS), is a classification of work sections in construction and is sometimes used to provide consistency in the arrangement of specifications and bills of quantities. For more information see Common Arrangement of Work Sections.
CAWS defines over 300 work sections which are designed to:
- Result in better co-ordination between drawings, specifications and bills of quantities;
- Give a predictable location for required information;
- Divide project information into work packages to give the contractor flexibility, and
- Result in fewer conflicts between documents.
CAWS is divided into 23 subheadings corresponding to each letter of the alphabet (except I, O and Y). The classification is as follows:
- A: Preliminaries
- B: Complete buildings / structures / units
- C: Demolition / alteration / renovation
- D: Groundwork
- E: In situ concrete / large precast concrete
- F: Masonry
- G: Structural / carcassing metal / timber
- H: Cladding / covering
- J: Waterproofing
- K: Linings / sheathing / dry partitioning
- L: Windows / doors / stairs
- M: Surface finishes
- N: Furniture / equipment
- P: Building fabric sundries
- Q: Paving / planting / fencing / site furniture
- R: Disposal systems
- S: Piped supply systems
- T: Mechanical heating / cooling / refrigeration systems
- U: Ventilation / air conditioning systems
- V: Electrical supply / power / lighting systems
- W: Communications / security / control systems
- X: Transport systems
- Z: Building fabric reference specification.
Each of the above subheadings is further sub-classified into related activities.
For example, G: Structural / carcassing metal / timber, is broken down into:
- G10 Structural steel framing
- G12 Isolated structural metal members
- G20 Carpentry / timber framing / first fixing
- G30 Metal profiled sheet decking.
For a full breakdown of the work sections listed from A to Z above, see Common arrangement of work sections classification.
CAWS has now been superseded for some purposes by the New Rules of Measurement (NRM). NRM 2 suggests that a work section breakdown structure for a simple project might be:
- Bill No. 1: Main contractor’s preliminaries.
- Bill No. 2: Off-site manufactured materials, components and buildings.
- Bill No. 3: Demolitions.
- Bill No. 4: Alterations, repairs and conservation.
- Bill No. 5: Excavating and filling.
- Bill No. 6: Ground remediation and soil stabilisation.
- Bill No. 7: Piling.
- Bill No. 8: Underpinning.
- Bill No. 9: Diaphragm walls and embedded retaining walls.
- Bill No. 10: Crib walls, gabions and reinforced earth.
- Bill No. 11: In-situ concrete works.
- Bill No. 12: Precast/composite concrete.
- Bill No. 13: Precast concrete.
- Bill No. 14: Masonry.
- Bill No. 15: Structural metalwork.
- Bill No. 16: Carpentry.
- Bill No. 17: Sheet roof coverings.
- Bill No. 18: Tile and slate roof and wall coverings.
- Bill No. 19: Waterproofing.
- Bill No. 20: Proprietary linings and partitions.
- Bill No. 21: Cladding and covering.
- Bill No. 22: General joinery.
- Bill No. 23: Windows, screens and lights.
- Bill No. 24: Doors, shutters and hatches.
- Bill No. 25: Stairs, walkways and balustrades.
- Bill No. 26: Metalwork.
- Bill No. 27: Glazing.
- Bill No. 28: Floor, wall, ceiling and roof finishings.
- Bill No. 29: Decoration.
- Bill No. 30: Suspended ceilings.
- Bill No. 31: Insulation, fire stopping and fire protection.
- Bill No. 32: Furniture, fittings and equipment.
- Bill No. 33: Drainage above ground.
- Bill No. 34: Drainage below ground.
- Bill No. 35: Site works.
- Bill No. 36: Fencing.
- Bill No. 37: Soft landscaping.
- Bill No. 38: Mechanical services.
- Bill No. 39: Electrical services.
- Bill No. 40: Transport.
- Bill No. 41: Builder’s work in connection with mechanical, electrical and transportation installations.
- Bill No. 42: Risks.
- Bill No. 43: Provisional sums.
- Bill No. 44: Credits.
- Bill No. 45: Daywork (Provisional).
[edit] Related articles on Designing Buildings Wiki
- Bills of quantities.
- BIM classification.
- Common arrangement of work sections.
- Comparison of SMM7 with NRM2.
- Construction Project Information Committee.
- Elemental cost plan.
- How to take off construction works.
- New Rules of Measurement.
- Preliminaries.
- Production information.
- Specifications.
- Standard Method of Measurement (SMM7).
- Uniclass.
Featured articles and news
Building Safety recap January, 2026
What we missed at the end of last year, and at the start of this...
National Apprenticeship Week 2026, 9-15 Feb
Shining a light on the positive impacts for businesses, their apprentices and the wider economy alike.
Applications and benefits of acoustic flooring
From commercial to retail.
From solid to sprung and ribbed to raised.
Strengthening industry collaboration in Hong Kong
Hong Kong Institute of Construction and The Chartered Institute of Building sign Memorandum of Understanding.
A detailed description fron the experts at Cornish Lime.
IHBC planning for growth with corporate plan development
Grow with the Institute by volunteering and CP25 consultation.
Connecting ambition and action for designers and specifiers.
Electrical skills gap deepens as apprenticeship starts fall despite surging demand says ECA.
Built environment bodies deepen joint action on EDI
B.E.Inclusive initiative agree next phase of joint equity, diversity and inclusion (EDI) action plan.
Recognising culture as key to sustainable economic growth
Creative UK Provocation paper: Culture as Growth Infrastructure.
Futurebuild and UK Construction Week London Unite
Creating the UK’s Built Environment Super Event and over 25 other key partnerships.
Welsh and Scottish 2026 elections
Manifestos for the built environment for upcoming same May day elections.
Advancing BIM education with a competency framework
“We don’t need people who can just draw in 3D. We need people who can think in data.”
Guidance notes to prepare for April ERA changes
From the Electrical Contractors' Association Employee Relations team.
Significant changes to be seen from the new ERA in 2026 and 2027, starting on 6 April 2026.
First aid in the modern workplace with St John Ambulance.
Solar panels, pitched roofs and risk of fire spread
60% increase in solar panel fires prompts tests and installation warnings.
Modernising heat networks with Heat interface unit
Why HIUs hold the key to efficiency upgrades.